8 March 2019

MUTP 3A gets Centre's nod

These include the CSMT-Panvel high-speed corridor and the Virar-Panvel local corridor.Sources in the railways explained that both plans need to be ...
Read more: MUTP 3A gets Centre's nod
(This story has been auto-generated from a syndicated feed)

Two crucial lines dropped to study new Mumbai DP

Three crucial Mumbai projects- the fast corridor for harbour line, a separate suburban corridor for Virar-Panvel and 19 AC local trains required for that ...
Read more: Two crucial lines dropped to study new Mumbai DP
(This story has been auto-generated from a syndicated feed)

Rs 30000 crore boost for Mumbai rail as cabinet clears MUTP-3A

5th and 6th line between Borivali and Virar ... CSMT-Panvel corridor and New Suburban Corridor between Panvel and Virar – were not approved by ...
Read more: Rs 30000 crore boost for Mumbai rail as cabinet clears MUTP-3A
(This story has been auto-generated from a syndicated feed)

Mumbai: Trains delayed on Western line due to technical failure near Mahim railway station

Due to technical failure near Mahim railway station, all train from Churchgate to Virar and Virar to Churchgate trains reportedly running late.
Read more: Mumbai: Trains delayed on Western line due to technical failure near Mahim railway station
(This story has been auto-generated from a syndicated feed)