22 April 2016

Railways plans to launch paperless ticketing for Mumbai suburban travel

Work on the fast elevated corridor – CST-Panvel elevated corridor and the Bandra-Virar premium corridor – is likely to begin by August 15.
Read more: Railways plans to launch paperless ticketing for Mumbai suburban travel
(This story has been auto-generated from a syndicated feed)

Railway ministry plans to invest Rs 40000 cr in Mumbai: Prabhu

... elevated corridors between Chhatrapati Shivaji Terminus and Panvel; Churchgate-Virar elevated corridor project to be completed in two phases.
Read more: Railway ministry plans to invest Rs 40000 cr in Mumbai: Prabhu
(This story has been auto-generated from a syndicated feed)

Prabhu announces elevated corridors for Mumbai local trains

... several projects, including elevated corridors between Chhatrapati Shivaji Terminus (CST) and Panvel and Churchgate and Virar in the city. Prabhu ...
Read more: Prabhu announces elevated corridors for Mumbai local trains
(This story has been auto-generated from a syndicated feed)

Mumbai's 3 big rail projects to start by August

These include an elevated rail corridor between Bandra and Virar, a road and rail corridor between CST and Panvel and cab signalling system on the ...
Read more: Mumbai's 3 big rail projects to start by August
(This story has been auto-generated from a syndicated feed)

CST-Panvel elevated corridor ground-breaking ceremony soon

The fast elevated corridor between CST and Panvel and the premium corridor between Bandra and Virar, which is a part of the Churchgate-Virar track, ...
Read more: CST-Panvel elevated corridor ground-breaking ceremony soon
(This story has been auto-generated from a syndicated feed)