27 October 2018

With bullet train, MMRDA feels new BKC can be built in Boisar

“The bullet train has halts at Thane, Virar and Boisar, with its terminus at BKC. Both Thane and Virar are already developed. There is land available in ...
Read more: With bullet train, MMRDA feels new BKC can be built in Boisar
(This story has been auto-generated from a syndicated feed)

Mumbai: HC doubts self-defence claim of policemen alleged of carrying fake encounter in ...

The Bombay High Court has rejected the claim of self-defence, made by two police constables, who shot down a history sheeter in Nalasopara, ...
Read more: Mumbai: HC doubts self-defence claim of policemen alleged of carrying fake encounter in ...
(This story has been auto-generated from a syndicated feed)