... and Vasai creeks and construct two structures within the 50m buffer zones for a 90-km pipeline that will supply drinking water to Vasai and Virar.
Read more: HC nod to build tunnel passing through Vasai mangroves, with riders
(This story has been auto-generated from a syndicated feed)