11 September 2017

India, Mumbai – Ahmedabad HSR Corridor Foundation Stone to be Laid

A total of 468 km of the track will be elevated, and a 27 km tunnel between Thane and Virar will allow the trains to pass under the sea, as per JICA's ...
Read more: India, Mumbai – Ahmedabad HSR Corridor Foundation Stone to be Laid
(This story has been auto-generated from a syndicated feed)